Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale

Product Details
Customization: Available
After-sales Service: 24 Hours on-Line
Warranty: 24 Hours on-Line
Still deciding? Get samples of US$ 4005/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 10 patents, you can check the Audit Report for more information
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (24)
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
  • Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
Find Similar Products

Basic Info.

Model NO.
XY-2-252*720
Certification
CE, ISO
Condition
New
Customized
Customized
Automatic Grade
Automatic
Structure
Horizontal
Front Roller Line Speed
1-12(M/Min)
Roller Speed Ratio
1:1:1
Maximum Width of Product
580mm
Minimum Thickness of Product
0.2mm
Motor Power
22kw
Transport Package
Pallet Gluing Machine
Specification
3950*1720*1210
Trademark
Junlin
Origin
Qingdao, Shandong, China
HS Code
8477800000
Production Capacity
600 Sets/Year

Packaging & Delivery

Package Size
395.00cm * 111.00cm * 169.00cm
Package Gross Weight
5000.000kg

Product Description

Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
Our company mainly produces open rubber mixing machines, rolling machines, film cooling lines, flat vulcanizing machines, automatic rubber mixing lines, recycled rubber equipment and their accessories.If you have any needs in this regard, feel free to leave me a message at any time
 

Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
 

XY-3R-252 Three Roll Rubber Calender Main Technical Specifications
  1. Ussage
The Three-roll calender is mainly used for the pressing sheet of rubber material, the bonding of rubber sheet and the rubbing of textile material or cord fabric
  1. Main technical parameters
  1. Diameter of roller :          252mm
  1. The working part length of roller:  720 mm
  2. Roller structure:        Hollow smooth roller     
  3. Roll arrangement form:         R type
  4. Calendered maximum products width:   ≤650mm
  5. Minimum thickness of calendered products: ≥ 0.2mm
  6. Roller production speed
Roll speed (Drive roll):    2.24 ~ 15.6r/min
Roller speed ratio (Upper, Middle and Lower rollers) : 1:1:1
8. Main motor:    6P-22Kw Frequency conversion motor
9. Reducer:                    Hard tooth surface reducer
  1. Distance adjustment device:      Electric
  2. Roller support structure:        Rolling bearing
  3. Lubrication method:           Diy oil lubrication
  4. Stock guide device:            Manual mobile
14.Total weight of equipment:      ~6t

 
  1. Equipment structure composition
  1. Roll group:                 Three groups
  2. Roller temperature adjustment device: Four groups
  1. Base and frame:             One group
  2. Distance adjustment device:    Two groups
  3. Stock guide device:          One groups
  4. Transimmion  mechianism:   One groups  
  5. Emergency stopping device:   One group
  6. Lubricating device:          One group
  7. Electrical control:           One group
  8. Tapping knife:              One group
  1. Structure description
  1. Roller and bearing group
1.1 Roller structure: All rollers are hollow smooth rollers.                            
1.2 Material: Alloy chilled cast iron, tempered and finished.
1.3 Roller working surface hardness: HS: 68 ~ 75
  1. Bearing adopts double row aligning roller bearing.                          
  2. The bearing seat is made of gray cast iron and processed by tempering
treatment. And with lubricating oil holes.
  1. Roller temperature adjustment device
4.1 Roller temperature regulating device form: Use closed roller temperature regulating device.
4.2 Water inlet and outlet of roller heating and cooling are connected through rotary joints.       
5. Base and frame
5.1 Base: Made of rectangular tube and steel plate welded, processed after annealing.
5.2 Frame: Welded by steel plate, processed after annealing.
6. Distance adjustment device
6.1 Adjustment range: 0.1~5mm
6.2 It is composed of nut, screw, motor, reducer, etc.
6.3 Distance Adjustment Mode: Electric
6.4 Power of distance adjustment motor: 0.37KW
7. Stock guide
7.1 The machine body is made of welding structure, then processed. The baffle plate adopts MC nylon.
7.2 Type of stock guide: movable
7.3 Adjustment Mode: Manual
8.Transmission mechanism
8.1 Main motor: YVP200L-6P -22KW AC Frequency conversion motor, speed 990rpm.(One Variable frequency drive)                            
8.2 Reducer: ZSY250 single input, single output, closed oil-immersed hard tooth surface gear reducer. Noise ≤78dB.
8.3 Reducer gearbox and motor coupling: Elastic pin coupling     
8.4 Reducer gearbox and motor coupling: Nylon rod pin coupling   
9. Emergency stop device
9.1 Brake type: Electric hydraulic brake
9.2 Installing the Emergency Stop Button
10. Electrical control:
 The main low-voltage electrical appliances use Chint, Delixi electrics
This is a picture of us attending the exhibition
 
Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale
It's an award and a lot of professional recognition


Rubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line WholesaleRubber Mixing Machine Calender Rubber Vulcanization Machine Calender Cooling Line Wholesale

Q1: Where is your factory located?

A1: Qingdao Junlin machine co.,Ltd is located at No. 9 Tangdao Bay Road, Huangdao district ,Qingdao city, China
 
Q2: Are you an integrated supplier for rubber machine ?
A2: Yes, we can provide the complete solution line to customer according to customer's requirement.

Q3: How about the quality control in your factory?
A3: Our company has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 72 hours and must be inspected carefully before shipment.

Q4: Will you offer the pre-sales service?
A4: Yes, we have an experienced pre-sales team to support customers not only including machine, technology also water .electrical, machine layout in factory, etc.

Q5: What about the after-service? Will you send your engineer to my country to help commission and install the machine?
A5: Surely, we have many experience technical engineers for oversea service, they would help you install machine and support training to workers also.

Q6: What is the delivery time of the machine?
A6: Actually, the delivery time of the machines are depended on the machines' options. Normally, the delivery time of standard machine could be within 30-45 days

Q7 : What is the warranty of the machine ?
A7: The whole machine's warranty period is 12 months and key parts will be depended.

Q8 : Do you provide any spare parts with machine?
A8: Yes, our company will provide one set standard spare parts to customer according to different machines.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier